• Stripping grass and topsoil
• Bulk excavation and bulk fill under level 1 GITA supervision
• Compaction to AS3798
• Sleeper retaining wall construction
• Road works along Heaslip Road DIT road, including water and sewer
connections
• Construction of 4m deep sewer including chambers
• Construction of stormwater, water, CST, electrical and NBN
• Installation of kerbing, kerb outlets, asphalt and linemarking
• Construction of pedestrian footpath with exposed concrete

Leave a Reply