- Demolition of existing slabs
- Excavating and removing topsoil
- Conditioning, trimming and compacting exposed subgrade to AS3798
- Bulk filling site to new design subgrade RL’s
- Preparing new building plateau
- Detailed excavation of building plateau footings
- Bulk excavating 250m3 stormwater soakage pit and construction filtration system